Home
/
Oil and Gas

Oil Jetty- Takoradi

Oil and Gas

Project Details

Client Name:

Ibistek Limited

Project Location:

Takoradi Port, Ghana

Project Period:

Phase 1 : 28th March to 1st August 2020

Phase 2 : 3rd January 2020 to 15th December 2021

Project Description

  • A modern Offloading Fuel facility “Oil Jetty” has been constructed by Amandi Holding Limited within the Port of Takoradi facilitated for IbisTek Limited
  • The project include All marine structural works as well as mechanical works required for the commencement of operations such as vessel berthing and delivery of fuel products to customer storage terminals have been completed
  • The Oil Jetty facility is equipped with offloading marine arms for five different Petroleum & Gas products, Quick Release Mooring Hooks  for berthing and mooring equipment and their control, Firefighting systems, stretch of 1.5km pipelines, heat tracing installation for Bitumen and HFO lines and a header station for connection to the clients (Terminals) with metering skids, electrical and control panels
  • Phase II of the project included the installation of a Flow Computer sets , Pig Receivers and Launchers ,Slop Tanks , Metering Skids and robust firefighting system
  • In addition, the main control & SCADA system to ensure safe monitoring and display of operations of the system in the control room which allow operation and indicating critical valve position, line pressure, tank levels

Project Image Gallery